Energy, Oil & Gas and Mining

Crews on rigs, vessels, mines and wind farms, on rotations that run all year. Plan who is on site, who relieves them and what happens when the relief is late.

  • Rotations such as 28/28 and 14/7 per crew
  • Reliefs tracked from planned to arrived
  • Certificates checked against each position
  • Hold-overs and overtime with approval

What gets in the way

Rotations that never stop

Crews work 28/28, 14/7 or their own pattern, and a spreadsheet loses track of who is on site next month.

Late reliefs

Weather and travel delay the relief, and the outgoing worker stays on with no record of why.

Tickets and certificates

Every position needs the right certificates, and an expired one is found too late.

How WIVSY 360 helps

Shifts & Rotations lays out every crew’s days from its rotation pattern, at each rig, vessel, mine or wind farm. Reliefs are planned and tracked to arrival, and when a relief is late the hold-over is recorded with its reason and approval.

  • Work sites with their own time zone and travel lead time
  • Rotation patterns repeated from each crew’s start date
  • Position requirements with the certificates each role needs
  • Reliefs from planned and confirmed to arrived, delayed or failed
  • Hold-overs, extra days and call-outs as overtime lines
  • Fatigue risk bands and a tamper-evident event log

A 14/7 rotation, with a relief handover

Three crews on 14 days on, 7 off, a week apart, keep two crews on site every day. Here the relief travels in a day late, so the outgoing worker is held over.

Three crews on a 14/7 rotation over four weeks, with a one-day hold-over on crew-change day while the relief travels in.Day 1Day 8Day 15Day 22Crew changeCrew ACrew BCrew C
On siteRestTravelHold-over

A typical month

  1. 1

    Planning

    Rotations are set per crew, and the schedule for the coming weeks is generated for every site.

  2. 2

    Before crew change

    Reliefs are planned and confirmed, and missing certificates show up before anyone travels.

  3. 3

    Crew change

    Reliefs move from in transit to arrived; a late one opens a hold-over with its reason.

  4. 4

    Month-end

    Overtime lines are approved, and the event log shows every change that was made.

The apps to look at first

See WIVSY 360 with your own team

Start a free trial with sample data, or let us walk you through it.

Start for free