Shift scheduling software for crew rotations and reliefs

Plan shifts, crew rotations and reliefs, round the clock. Build a rotation once, and every crew’s days are laid out from it, with reliefs and hold-overs tracked as they happen.

  • Rotations such as 28/28, 14/7 and DuPont, or your own
  • Crews with staggered starts at every site
  • Reliefs tracked from planned to arrived
  • Hold-overs, overtime and fatigue risk in one place

Everything a rotation needs

For sites that never close: rigs, vessels, mines, plants, wind farms and camps, or any site with posts covered round the clock.

Work sites

Each site has its own time zone and travel lead time, and site managers see only the sites they manage.

Rotation patterns

28/28, 14/7, DuPont or your own cycle of work, rest, travel and training days, repeated from each crew’s start date.

Crews

People who rotate together. Stagger crews with different start dates, and keep a relief pool to cover the others.

Position requirements

How many of each role must be on duty at a site every day, and which certificates they need.

Certifications

Certificates with issue and expiry dates. Only verified ones count when an assignment is checked.

Day-by-day schedule

Generated from the patterns for the weeks ahead, with leave, relief and hold-over overrides on top.

A 14/7 rotation, with a relief handover

Three crews on 14 days on, 7 off, a week apart, keep two crews on site every day. Here the relief travels in a day late, so the outgoing worker is held over.

Three crews on a 14/7 rotation over four weeks, with a one-day hold-over on crew-change day while the relief travels in.Day 1Day 8Day 15Day 22Crew changeCrew ACrew BCrew C
On siteRestTravelHold-over

A crew change, step by step

  1. 1

    Plan the relief

    The relief for each outgoing worker is planned ahead of their last day, with the site’s travel lead time.

  2. 2

    Track it

    The relief moves from planned to confirmed, in transit and arrived, or is marked delayed or failed.

  3. 3

    Hold over if late

    When a relief is late, the outgoing worker’s hold-over is recorded with its reason, such as weather, and sent for approval.

  4. 4

    Count the extra time

    Extra days, emergencies, call-outs and holiday work become overtime lines to approve.

Rules, fatigue and a record you can trust

Set scheduling rules once for the company and change them per site. Fatigue scores put each person in a risk band, and every scheduling event is written to a log that cannot be edited.

  • Company rules with per-site changes: rest hours, continuous days, minimum crew
  • Fatigue risk bands from low to critical, with the score explained
  • Overtime lines from calculated to approved and paid
  • Append-only event log, each entry chained to the one before